Chlorine gas storage and dosing
Storage and dosage

Input data

Flow

Prechlorination average dosing rate

Postchlorination average dosing rate

Prechlorination maximum dosing rate

Postchlorination maximum dosing rate

Output data

Flow

Chlorine consumption

50 kg cylinder consumption

Maximum prechlorination dosing rate

Maximum postchlorination dosing rate

Description

Given the water flow to be treated and the desired concentration of chlorine in water, calculates the chlorine gas consumption, the number of cylinders (50 kg each) to be stored and prepared and the mass dosing flow.

References

  • VIANNA, Marcos R. Casas de química para estações de tratamento de água. 2. Ed..Nova Lima: Imprimatur, 2001. 190 p.