Sludge dewatering: presses and geotextile bags

Select calculation method

Input data

Dry solids to dewater

Feed sludge solids (% TS)

Solids capture

Cake dryness (% TS)

Polymer dose (per tonne of dry solids)

Operating days per week

Operating hours per day

Belt width per press

Polymer solution concentration

Feed sludge density

Cake density

Solids loading per metre of belt

Hydraulic loading per metre of belt

Wash water per metre of belt

Output data

Feed sludge flow (weekly average)

Feed flow while operating

Polymer consumption

Polymer solution flow while operating

Dry solids in the cake

Cake produced

Cake volume

Filtrate returned to the plant

Solids in the filtrate

Filtrate suspended solids

Belt width required

Presses in operation

Solids loading on the installed belt

Hydraulic loading on the installed belt

Belt wash water (weekly average)

Description

Dewatering of sludge by belt press, screw press or geotextile bags, on one mass balance. A fraction of the solids, the capture, leaves in the cake at the cake dryness; the rest returns to the plant with the filtrate.

Mt=Ms⋅capturaMtorta=MtSTtM_t = M_s \cdot captura \qquad M_{torta} = \frac{M_t}{ST_t}

Qf=Ql+Qpol+Qlav−MtortaρSSf=Ms−MtQfQ_f = Q_l + Q_{pol} + Q_{lav} - \frac{M_{torta}}{\rho} \qquad SS_f = \frac{M_s - M_t}{Q_f}

Polymer consumption from the dose per tonne of dry solids, and its dosing flow at the solution concentration. Presses and feed pumps run part of the week, so the hourly loads are the weekly solids concentrated into the operating hours:

Ms,op=7 MsD HM_{s,op} = \frac{7 \, M_s}{D \, H}

Belt press. Belt width for the larger of the solids loading (kg/(m.h)) and the hydraulic loading (m³/(m.h)), rounded up to whole presses, plus the belt wash water returned with the filtrate. A thin feed is governed by the hydraulic load; thickening upstream shrinks the press.

Screw press. Units for the larger of the solids and hydraulic capacity per unit.

Geotextile bags. Dry solids per bag from its volume and the dryness at the end of filling, fill time, bags per year, bags on the pad while filling and drying, pad area, and the mass for disposal at the dryness reached after drying:

Mbag=Vbag ρt STttench=MbagMtNpatio=⌈tench+tsectench⌉M_{bag} = V_{bag} \, \rho_t \, ST_t \qquad t_{ench} = \frac{M_{bag}}{M_t} \qquad N_{patio} = \left\lceil \frac{t_{ench} + t_{sec}}{t_{ench}} \right\rceil

Typical values, to be confirmed with the manufacturer and tests on the sludge (undigested excess activated sludge sits at the low end):

Capture (%)Cake (% TS)Polymer (kg/t TS)Capacity
Belt press90165120 kg/(m.h), 10 m³/(m.h)
Screw press92186100 kg/h, 15 m³/h per unit
Geotextile bags9815 at filling, 30 after drying6100 m³ per bag

References

ANDREOLI, C. V.; VON SPERLING, M.; FERNANDES, F. Sludge Treatment and Disposal. Biological Wastewater Treatment, v. 6. IWA Publishing, 2007.

METCALF & EDDY. Wastewater Engineering: Treatment and Resource Recovery. 5th ed. McGraw-Hill, 2014.